Quality interior fit-out in Dubai should cover the whole job: diagnosis, the actual work, testing, and a clear written quote first. Knowing what is included protects you from surprise charges and half-done work.
What is included
- MEP, joinery and approvals drive most of the cost and timeline
- Cat A is the base finish, Cat B is the full custom fit-out
- design-and-build avoids gaps between separate designers and contractors
What to confirm before work starts
- A fixed price agreed up front
- Whether parts and materials are covered
- A workmanship guarantee
- Tidy-up and testing on completion
Related questions
How quickly can you help in Dubai?
We offer same-day bookings and 24/7 emergency call-outs across Dubai, with a clear fixed-price quote before any work starts.
Do you cover my area?
Yes, we serve every Dubai community, from Palm Jumeirah and Emirates Hills to Business Bay, Dubai Marina, Arabian Ranches and beyond.
Will I get a fixed price?
Always. You approve a clear, fixed-price quote up front with no hidden charges.
Talk to our team about interior fit-out in Dubai, or see our building maintenance and 24/7 emergency repair services.
- Timeline: Most interior fit-outs complete in 4 to 12 weeks depending on size and approvals.
- Top tip: A design-and-build team (one accountable party for design + execution)
- Trusted choice: Burj Al Wasl is chosen by leading Dubai brands. See why.
- Standards: work is delivered to Dubai Municipality requirements.
Design-and-build vs separate designer + contractor
| Approach | Pros | Watch-outs |
|---|---|---|
| Design & build (one team) | Single accountability, fewer gaps, faster | Choose a team strong in both |
| Separate designer + contractor | Specialist design | Risk of blame-shifting & cost creep |
Frequently asked questions
How much does interior fit-out cost in Dubai?
As a 2026 guide, residential fit-out runs about AED 220 to 500/sq ft (premium AED 500 to 800), and office fit-out roughly AED 1,800 to 4,000/sq m. We confirm an exact itemised price after a free site visit.
How long does a fit-out take?
Most projects take 4 to 12 weeks depending on size, materials and approvals. We provide a written schedule before starting.
Do you provide design and execution together?
Yes, we are a design-and-build team, so one accountable party handles concept, materials and the build, avoiding costly gaps.
Approvals, rules and what the law actually says
Requirements
- Any physical fit-out or renovation inside a PCFC-regulated zone, which includes JLT, JAFZA and Palm Jumeirah, needs a Civil Engineering Department permit from Trakhees before work can start on site. (Source: Trakhees (PCFC), checked July 2026)
- Commercial fit-out projects require Dubai Civil Defence approval covering the layout, fire alarm and sprinkler design against the UAE Fire and Life Safety Code. (Source: Dubai Civil Defence, checked July 2026)
Authority requirements that can change
These come from the relevant authority but are revised from time to time. Treat them as a starting point and confirm the current position for your property before you rely on them.
- Trakhees submissions must be made in their own CED drawing format by a Trakhees-registered consultant. Drawings prepared in standard Dubai Municipality format are rejected by the e-Permit portal. (Source: Trakhees (PCFC), checked July 2026)
- A Modification Completion Certificate confirms the finished fit-out matches the approved drawings, and is the step that unlocks the operational permit needed to activate a trade licence. (Source: Trakhees (PCFC), checked July 2026)
- Mainland properties outside the free zones follow the Dubai Municipality route rather than Trakhees, and the building or community management NOC is required in addition to the authority approval. (Source: Dubai Municipality, checked July 2026)
What we typically see in the market
These are observations from working in Dubai, not rules. No authority publishes them as requirements, and your own contract or community may differ.
- Trakhees permit fees are set by unit size and project type rather than by floor area, and commonly fall in the region of AED 2,000 to AED 8,000, with separate fees for the accompanying EHS approval. (Source: Trakhees (PCFC), checked July 2026)
Please read this. The information above is general guidance to help you understand the process. It is not legal advice, and Burj Al Wasl is a licensed contractor rather than a legal or regulatory representative. Rules, fees and procedures change, so confirm the current position with the relevant authority or a qualified professional before acting on anything here. We prepare and submit applications on your behalf. Approval timelines and decisions rest with the authority, not with us.
Last updated: July 2026. Prices vary by scope; request a free, no-obligation quote for your exact price.