TV Units & Feature Walls in Dubai, Burj Al Wasl

TV Units & Feature Walls

The living-room focal point done beautifully. Burj Al Wasl designs and builds TV units and feature walls in Dubai with concealed cabling, lighting and premium materials.

What we create

  • Bespoke media/TV walls with hidden cable management
  • Feature walls in fluted timber, stone, marble or panelling
  • Floating units, shelving and display niches
  • Integrated LED lighting and AV
  • Coordinated with joinery and finishes

Seamless and striking

We conceal wiring, integrate sound and lighting. Finish in durable, on-trend materials for a clean, statement wall that anchors the room.

Warning signs you should not ignore

Book a free interior fit-out assessment in Dubai if you notice any of these, and we will diagnose and fix it before it gets worse, with same-day and 24/7 emergency call-outs across the city:

  • A bare shell or new unit that needs finishing
  • Tired, dated interiors due for a refresh
  • Poorly used space or an awkward layout
  • A brand or office refresh before a relaunch
  • A fixed handover or opening deadline to hit

What our interior fit-out service in Dubai covers

One accountable team handles the full scope for apartments, villas, townhouses and commercial buildings across Dubai, built for the local climate and to Dubai Municipality, DEWA and developer requirements:

  • Space planning and interior design
  • Gypsum ceilings and partitions
  • Bespoke joinery and wardrobes
  • Flooring in tiles, wood, vinyl or marble
  • Painting and decorative wall finishes
  • Kitchen and bathroom fit-out
  • Lighting and electrical works
  • MEP coordination and approvals
  • FF&E supply and installation on request
  • Snag-free handover and aftercare

Approvals and compliance we handle

Burj Al Wasl does not just do the work, we handle the approvals. For your interior fit-out project in Dubai we prepare the drawings, NOCs and authority submissions so everything is permitted and signed off, with our trade licence and the relevant permit numbers shared on request:

  • Dubai Municipality / DDA fit-out permits
  • Building-management NOCs
  • DCD fire-safety approvals
  • MEP and civil submissions

We submit to and follow the standards of Dubai Municipality, Dubai Civil Defence.

Brands we service

Our technicians install, service and repair the leading brands used across Dubai for interior fit-out, sourcing genuine parts so your equipment keeps its performance and warranty:

Design-and-build vs separate designer + contractor

ApproachProsWatch-outs
Design & build (one team)Single accountability, fewer gaps, fasterChoose a team strong in both
Separate designer + contractorSpecialist designRisk of blame-shifting & cost creep

How it works

  1. Free consultation and on-site measurement
  2. Concept design and material / finish selection
  3. Itemised, fixed-price quotation with timeline
  4. Fit-out execution by skilled in-house trades
  5. Snag-free handover and aftercare

Typical timeline: Most interior fit-outs complete in 4 to 12 weeks depending on size and approvals.

How to choose the best interior fit-out company in Dubai

  • A design-and-build team (one accountable party for design + execution)
  • A clear, itemised quotation with materials specified upfront
  • A portfolio of finished work and recognisable clients
  • Durable materials suited to Dubai's heat and humidity

Red flags to avoid

  • Vague lump-sum quotes with no itemised breakdown (they tend to grow later)
  • No portfolio, references or verifiable completed projects
  • No clear contract, timeline, payment schedule or aftercare
  • Reluctance to handle Dubai authority approvals (Municipality, DEWA, DCD)
  • Prices far below the market, usually a sign of cut corners or hidden extras

Approvals, rules and what the law actually says

Requirements

  • Any physical fit-out or renovation inside a PCFC-regulated zone, which includes JLT, JAFZA and Palm Jumeirah, needs a Civil Engineering Department permit from Trakhees before work can start on site. (Source: Trakhees (PCFC), checked July 2026)
  • Commercial fit-out projects require Dubai Civil Defence approval covering the layout, fire alarm and sprinkler design against the UAE Fire and Life Safety Code. (Source: Dubai Civil Defence, checked July 2026)

Authority requirements that can change

These come from the relevant authority but are revised from time to time. Treat them as a starting point and confirm the current position for your property before you rely on them.

  • Trakhees submissions must be made in their own CED drawing format by a Trakhees-registered consultant. Drawings prepared in standard Dubai Municipality format are rejected by the e-Permit portal. (Source: Trakhees (PCFC), checked July 2026)
  • A Modification Completion Certificate confirms the finished fit-out matches the approved drawings, and is the step that unlocks the operational permit needed to activate a trade licence. (Source: Trakhees (PCFC), checked July 2026)
  • Mainland properties outside the free zones follow the Dubai Municipality route rather than Trakhees, and the building or community management NOC is required in addition to the authority approval. (Source: Dubai Municipality, checked July 2026)

What we typically see in the market

These are observations from working in Dubai, not rules. No authority publishes them as requirements, and your own contract or community may differ.

  • Trakhees permit fees are set by unit size and project type rather than by floor area, and commonly fall in the region of AED 2,000 to AED 8,000, with separate fees for the accompanying EHS approval. (Source: Trakhees (PCFC), checked July 2026)

Please read this. The information above is general guidance to help you understand the process. It is not legal advice, and Burj Al Wasl is a licensed contractor rather than a legal or regulatory representative. Rules, fees and procedures change, so confirm the current position with the relevant authority or a qualified professional before acting on anything here. We prepare and submit applications on your behalf. Approval timelines and decisions rest with the authority, not with us.

Related services

Clients often pair this with Kitchen Renovation & Fitting, Bathroom Renovation & Finishing, Joinery & Carpentry Finishing, Wallpaper & Decorative Wall Finishes. Every project is delivered to Dubai Municipality standards.

Updated for 2026 ยท includes an indicative price guide ยท Last reviewed Aug 2026

Areas We Serve Across Dubai

TV Units & Feature Walls is available across Dubai, including:

Palm Jumeirah Jumeirah Emirates Hills Dubai Hills Estate Downtown Dubai Business Bay Dubai Marina JBR JVC JLT Sheikh Zayed Road Al Barsha Arabian Ranches The Springs DAMAC Hills District One Jumeirah Golf Estates

Frequently Asked Questions

Yes. We design concealed cable management and ventilated compartments for media devices for a clean look.

Fluted timber, stone/marble, microcement, panelling and back-lit options all work well. We advise to match your interior.

Yes. We integrate LED lighting and AV/soundbars or speakers into the media wall.

In 2026, residential fit-out runs about AED 220 to 500 per sq ft (premium AED 500 to 800), and office fit-out roughly AED 1,800 to 4,000 per sq m. The exact figure depends on materials, joinery and MEP; we give an itemised fixed quote after a site visit.

Most fit-outs take 4 to 12 weeks. Small office or retail fit-outs run 4 to 6 weeks, while larger or bespoke projects take 8 to 12 weeks including approvals, procurement and execution.

Yes. Fit-out work needs a permit from Dubai Municipality, DDA or the relevant free-zone/community authority, with a building NOC plus architectural, MEP and fire drawings. Approvals usually take 3 to 10 working days. We handle the full submission for you.

Cat A delivers the base finish (flooring, ceilings, basic MEP, blank space). Cat B is the full custom fit-out: partitions, branding, joinery, lighting and furniture that make the space ready to use. Most clients need Cat B.

Yes. We are a design-and-build contractor, so one accountable team manages concept, material selection, approvals and construction. That avoids gaps, cost creep and blame-shifting between separate designers and contractors.

Get an itemised fixed quote, invest where it shows (joinery, lighting, flooring) and save where it does not, use durable materials suited to Dubai's heat and humidity, and use one design-and-build team to avoid costly reworks.

Interior Finishing

Need help?

+971 50 500 1765

Our specialists are available 24/7 across Dubai.

WhatsApp
Why Burj Al Wasl

Built on trust,
proven across Dubai.

Premium quality, fair prices and a professional, standardised way of working that homes and businesses across Dubai rely on.

  • Affordable, honest pricing Fair, fixed-price quotations with no hidden costs.
  • 15+ years of experience Hands-on team expertise across every trade in Dubai.
  • Professional & standardised Trained teams, method statements and quality checks.
  • One accountable team A single point of contact manages every trade.
  • Authority compliant Delivered to Dubai Municipality, DCD, DEWA and DHA standards.
  • 24/7 response Priority emergency help across Dubai, day or night.

Get a Free Quote Today, No Obligation

Trusted across Dubai's leading communities. Tell us what you need and our specialists will arrange a free site visit and an honest, fixed-price quotation, fast response, quality workmanship and fair prices, every time. Same-day call-outs available.

Serving all of Dubai & the UAE · 24/7 emergency response

Approvals handled: We obtain Dubai Municipality, DEWA, SIRA, DHA and Dubai Civil Defence approvals for your project.

200+ projects delivered Workmanship warranty Free site visit + fixed quote Same-day & 24/7 response

Send us a photo of the issue on WhatsApp for a fast, no-obligation quote.

Happy with our work? Rate us on Google ★

Areas We Specialise In Across Dubai

We give special priority to Dubai and work daily in the emirateโ€™s most prestigious communities, including Palm Jumeirah, Jumeirah, Emirates Hills, Dubai Hills, Downtown Dubai, Business Bay, Dubai Marina, JBR, JVC, JLT, Sheikh Zayed Road, Arabian Ranches, The Springs, DAMAC Hills, District One, Jumeirah Golf Estates and Al Barsha. Wherever your property is, we proudly serve every community across Dubai, and the wider UAE. No location is too far: just tell us where you are and we will come to you.

Burj Al Wasl Dubai team
Ready to start?

Crafting spaces that reflect your style

Get a free quote within the hour. Call, WhatsApp, or download our company profile.